top of page

Blog


1450 Blanca Street Vancouver, BC
Restoration Work Completed the gym with MDF boarding walls Sound insulating ceiling and finish it with 5/8 drywall Apply special squash paint through whole place. Redo hardwood flooring, refinish flooring.
1 day ago


1178 Heffley Crescent Coquitlam, BC
Home owner wanted to sell their condo and based on the realtor recommendation they wanted to modify kitchen to be able to sell their unit which we did modify their kitchen . We also closed one wall in their living room convert an open space to den so adding value of having tow bedroom and one den.
1 day ago


10499 University Drive Surrey, BC
Restoration Work Due to fire sprinkler Burst majorly common hallways got flooded and including multiple units our team performed from demo to Emergency boarding, insulation, drywall, paint, electrical and ceiling texture.
1 day ago


7108 Collier Street Burnaby, BC
Restoration Work Complete insinuation and drywall entire unit due to fire damage.
1 day ago


16068 83ave – Fleetwood Gardens Surrey, BC
Restoration work: due to fire sprinkler burst multiple units got flooded including common hallway. We performed from demo to complete repair including insulation, boarding, paint, finish carpentry, flooring, cabinetry, electrical and plumbing.
1 day ago


3677 Victoria Drive Vancouver, BC
Due to fire sprinkler got activated at the sixth floor and Multiple units got affected. Our team performed Demo, repair including Emergency boarding, boarding interior walls, Paint, Flooring, Kitchen cabinets, and carpentry work. There was repair in common hallways as well.
1 day ago


4660 Westlawn Drive Burnaby, BC
Restoration work, completed with Drywall repair, and paint. Replace kitchen cabinetry, vanity. Replaced flooring
1 day ago


Richmond BC
In this project we completed with Kitchen and Bathroom remodel as well as remove and replace some existing walls and repair interior walls. Complete painting the house.
1 day ago


Tim Hortons 1299 Robson Street Vancouver, BC
We carried out a kitchen renovation due to mold growth in certain areas. Since we only had a two-day window to shut down the Tim Hortons, we had to act fast. Our scope of work included demolition, installing new plywood panels and FRP panels, replacing the dump sink, and completing upgrades.
1 day ago


Shifeon Enterprise LTD 1291 Robson street, Vacouver, BC
Due to mold growth from a neighboring store, we needed to remove several store shelves and cabinets, as well as the existing wall boards. While the store remained open during business hours, we performed heavy masking in our work area to contain dust and debris. Despite the challenges, we carried out the work efficiently and successfully completed the renovation.
1 day ago


1 day ago


1 day ago


1 day ago


Nail Salon Construction & Design in Coquitlam
Designing and building a nail salon in Coquitlam is more than just creating a beautiful space—it’s about combining functionality, comfort, and brand identity into one seamless experience. A well-designed nail salon not only attracts clients but also improves workflow, hygiene, and overall customer satisfaction. Smart Planning for Nail Salon Construction Before starting construction, having a clear plan is essential. This includes defining the layout, selecting materials, and
Mar 25


Medical Clinic Construction
Constructing a medical clinic requires a careful balance between functionality, safety, and patient comfort. Unlike typical commercial spaces, clinics must meet strict healthcare standards while creating an environment that feels welcoming and professional for patients. Planning and Compliance The first step in building a clinic is strategic planning . This includes selecting the right location, defining the type of services offered, and ensuring compliance with local healthc
Mar 25


Dental Clinic Construction
Building a dental clinic requires a precise combination of medical functionality, technical infrastructure, and patient-centered design. Unlike standard commercial spaces, dental clinics must accommodate specialized equipment while maintaining strict hygiene and safety standards. Planning and Regulatory Requirements The foundation of a successful dental clinic begins with careful planning . This includes choosing the right location, defining services (general dentistry, cosme
Mar 25
bottom of page
